from groundbreaking to ribbon cutting, this project lasted a meer 90 days. it is a 3,000 square foot facility plus a drive-thru section. this project included the building trades of masonry, wood and steel construction and was constructed throughout a winter season.
incorporated into the structure was a standing seam metal roof and curwensville limestone from a local quarry.